Laserfiche WebLink
Reclamation Scheduling <br />Action Taken <br />Bonds procured <br />Sediment Control <br />Topsoil removed end stored <br />Rough grading <br />Final grading (Phase I bond release <br />is reedy for implementation) <br />Spoil sampling <br />Arses which ere severely compacted <br />rill be ripped on the contour, and <br />topsoil replaced from stockpiles <br />or direct hauled <br />Topsoil sampling to verify <br />replacement depths <br />Area is drill seeded with the <br />appropriate perennial seed mix, <br />is seeded, shrubs or trees ere <br />planted as spring or fall <br />dormant plantings (Phase II bond <br />release is reedy for implementation). <br />A smell grain cover crop is applied <br />at a rate of 20 (drilled) or 40 <br />(broadcast) lbs/acre <br />Time Period <br />Prior to mine disturbance <br />Prior to mine disturbance <br />Prior to mining excavation <br />Prior to creating 4 spoil ridges or less than <br />180 days unless approved by variance (see <br />Exhibit 79-)) <br />.,. , ... ,.:~ .i <br />Per scheduler~shovn on rE xh itiit )9-i ' <br />r' - <br />After final grading is completed and prior to <br />soil replacement ~ <br />Within one year after final grading is <br />completed, provided the area is not required <br />for facilities as described in the Projected <br />Bac kfilling and Grading Schedule section <br />After an area has been topsoiled ~a nd prior <br />to any seeding of reclaimed areas ' <br />.. <br />First appropriate planting season <br />after topsoil is replaced <br />B Revised 03/01/95 <br /> <br />Ci <br /> <br />