Laserfiche WebLink
• Action Taken <br />Replaced topsoil and upper three <br />feet of final graded spoil will <br />be sampled, tested and evaluated. <br />Soil amendments will be added when <br />indicated by the results of soil <br />tests <br />Time Period <br />Tears 3, 4, or 5 after permanent seeding <br />Rill end gully monitoring end repair, Tears 1 through 8 after permanent <br />maintenenc e, end normal husbandry seeding <br />activities. Revegetation monitoring. <br />Revegetation success evaluations <br />based on criteria and parameters <br />presented in Tab 22 <br />Years 9 and 10 after permanent seeding <br />ohase ll( bond release is ready for <br />• implementation <br />Cessation of Ooerations <br />After all disturbed areas have been <br />observed for a minimum of ten years <br />In the event a cessation of mining end reclamation operations is to occur for a period of <br />30 days or more, or as soon as it is known that a temporary cessation will extend beyond <br />30 days, the Division will be notified. Yi thin 90 days after notification, a notice of <br />intention to cease temporarily or abandon operations will be submitted to the Division <br />defining the intormation required in Section 4.30.1 end 4.30.2 as applicable. The <br />cessation plan will be developed in consultation with the Division. <br />• <br />9 <br />