Laserfiche WebLink
• the coal acreage tc be mined during the next year will have been disturbed by topsoil <br />removal activities. The total annual disturbed acreage figures in the table .include the <br />coal areas mined and the advance topsoil removed areas, as well as the other disturbances <br />including spoil areas, existing and proposed haul roads, power lines,. storage yards, and <br />facilities. In order [o avoid [he confusion created by too many overlapping yearly lines, <br />only the graded areas for each year are shown on the BackfilLing and Grading Bchedul e,~ <br />Exhibit 19-7. The facilities including utility lines, haul roads, drainage and sediment <br />control structures, and the dragline erection pad are illustrated on Exhibit 12-2 and <br />Exhibit 73-1, and are described in Tab 13. The areas of land that will be disturbed <br />through the five-year permit term are shown on Exhibit 20-1. The backfilling and grading <br />schedule is shown on Exhibit 19-1. Reclamation costs are discussed under Tab 25, Bonding. <br />P ': dC. <br />,.1 <br />~ / - <br /> <br /> <br />7 <br />