Laserfiche WebLink
<br />(... <br />`~'ti <br />I <br />4. Compliance (who is responsible, what is to he done,_and how often) <br />Annual compliance inspections will be done by the area geologist or <br />surface reclamation specialist. Apre-construction onsite will be <br />required. An inspection just prior to and just after final <br />reclamation will be done by the surface reclamation specialist. <br />i <br />$. TlonitorinF (who is responsible what is to be done, and how often) <br />The site will be monitored annually for three years following <br />reclamation to determine reclamation success. <br /> <br />6. S[ioulations (use Standard Stipulations <br />to Soecial Stioulati <br />1., Reclamation will be in accordance with submitted Soil Conservation <br />Service Reclamation Plan. <br />2.. Trees on the southern boundary of the pit area will be left intact <br />to act as visual screening. <br />3.. Highwalls will not be authorized. <br />Approv~:d b}•: L" <br />Ar <br /> <br />~~- 9~ <br />Date <br />co-050-1790-157 <br />8/1/S6 <br />r,~e . <br />^ of <br />