My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107381
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:54 PM
Creation date
11/24/2007 3:11:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
NPDES PERMIT YOAST MINE
Section_Exhibit Name
TAB 15 APPENDIX 15-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF hlFrfLTN -Water Quality Control Divrsion <br />Rationale -Page 6 Permit No. COR-0400010 <br />• Division. (Note: Under the Federd rcgulationr, this it referred to as a Notla ojlntent, or NOI. For imerna[ <br />ronsistenry with iu eurtcm program, the Division will cominue to use the term 'application.) This application will be <br />evaluated utilizing the criteria outlined prtviorttly. <br />A. Aoolication <br />The application shall require, at a minimum: <br />1. Name, and addrus of the applicant; <br />2. Site address and location; <br />3. Fariliry romaa Anson and telephone number,• <br />4. Standard /ndustrial Classification (SIC! rode(sJ; <br />5. The size of the mining operation in acres; <br />6. Status as active ar inaaiHe; <br />7. Lut of any othn environmental pmnits currently held by the facility; <br />8. Aaiviriu whidt take place m the site; <br />9. Receiving warns; and <br />10. For new arrive mining opnmions (beginning opnmions aJln 10/1/92! or existing jacilitiu applying after <br />7/1/93, certification as to the preparation of a SR'MP. (See Section V/I.B ojthe Rationale far SWMP <br />cert~cation rcquirnnems for existing mining opnaiioas applying an time!. Inactive mining opnmions <br />applying aftn July 1, 1994 must submit a eerthcation as to the prcparmion and impkmemmion of a SWMP. <br />B. Procersin¢ Trme <br />If this gcneral permit rs suitable for the applirom's opnmion, then a certification will be developed and the <br />applicam will be coshed under this general permit. <br />The Division shall haHe up to thirty days aJtn receipt of the abort information to requut additional data and/or <br />deny the authorization for any particular discharge. Upon receipt of additional information, the Division shall <br />have an additional fifteen days to issue or deny aahortzation jot the particular dscharge. <br />If the applicam dues rot receive a requut for additional information or a notification of denial from the Division <br />dated within thirty days of the receipt of the applicmion by the Division, authorization to discharge in accordance <br />with the conditions of this permit shall be deemed grained. <br />If, after evaluation of the application (or additional information, suds ar the SNMP), it is found that this genna! <br />permit is not suitable for the opnmion, then the applicuion may be protrssed as one for an individual permit, or <br />a more appropriate genna/ permit. The applicant will 6e noted of the Division's decision to deny certifcmion <br />under this general permit. For an individual permit, additional information may be requested, and ]80 days will <br />6e required to process the application and issue the permit. Tnnporary Cos+erage under the general pmnit will 6e <br />allowed umil the individual permit you imo effect. (Sec discussion, section //.A of the Rmionak.J <br />C. Chance in Farilirv Conditions or Oonmions <br />A'hik certified urdn this genna! permit, if the mining opnmion change such that rovnage undn this genna! <br />permit is no longs applicable, the pnmimee will be required by the Division to apply for an individual permit, or <br />seek cosrrage under a differem general permit. CoNerage will continue under this general permit umi! issuance of <br />the orhn permit or cert~cation. <br />Vll. STORMA'ATER MANAGEMENT PLANS <br />• A stormwmn managemem plan (SR'MPJ shall be developed and impkmemed for each mine rovered by this permit. The <br />plan shall idemify potemial source of pollraian (including sedimemJ which may reasonably be expected to affect the <br />
The URL can be used to link to this page
Your browser does not support the video tag.