Laserfiche WebLink
12/16/2005 16:04 9709295595 WEST ELK I PAGE 11 <br />2413504 well Project Plan ~ <br />A~wOr Revision 332 <br />Page 9 of 11 ~ <br />1. Upon completion of each phase of activity at a giveo site, all debris, tra4h, aad <br />drilling related equipment, will be removed from the site. <br />Z. When the mud pit or pits are sufficiently dry,~fhey vhli be 5lled with stored <br />sub-soil material and compecbed to nnirumize a,ay settling. <br />I <br />3_ A baclrhoe and a bulldozer will redistribute material. on and around the drill <br />pad to achieve as closely as practicable the original contoru of the site. The <br />area will then be ripped or scarified. <br />4. Stored topsoil will be distributed as evenhy as possible Deer the disturbed pad <br />area I <br />5. The entire drill pad area and reclaimed roads will be re-seeded acing the <br />USFS/CDMG-agreed seed mix (desadbed below) for zeclamation purposes on <br />National Forest Service lands (oor~espoadeace tegardinig MCC 2005 Armual <br />Operating Phan dated May 13, 2005 fimn Levi 13royles, USFS to ]ltiltre <br />Peacock, MCC. <br />USFSfCDMt9-Agreed Seed Niic - Mou~rtain Shrub Fbtbltat Type <br />This sped mu!drve will be a miniuttum of 99 percent pure live seed containing a <br />maximnm of l percent weeds none of which are nmxious. Sced must be <br />distributed at specified pomnds per acre. <br />