Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Page 35 of 136 <br />1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 5400 feet <br />Net Correction: I 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />CAT HB <br />Job Efficiency: <br />0.830 <br />NA <br />CAT HB <br />Site Altitude: 5400 feet <br />Net Correction: I 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />650.00 <br />3.00 <br />5.00 <br />8.00 <br />1131 <br />0.62 <br />Haul Time: 0.62 minutes <br />Refitrn Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />650.00 <br />-3.00 <br />5.00 <br />2.00 <br />2960 <br />0.35 <br />Return Time: <br />035 <br />minutes <br />Total Scraper team cycle time: <br />2.57 <br />minutes <br />Adjusted for job conditions: <br />1,123.89 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,123.89 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,123.89 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,354.09 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.651 /LCY <br />Total job time: 32.70 Hours <br />Total job cost: $23,921.69 <br />CIRCES Cost Estimating Software <br />