My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106748
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:23 PM
Creation date
11/24/2007 2:12:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
10/31/2014
Section_Exhibit Name
EXHIBIT 25 RECLAMATION BOND
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 34 of 136 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Refuse Pile <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 Permit/Job #: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 019 State: Colorado <br />Date: 9/6/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: I Cat 637G <br />- Dozer: I NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C044 -019 <br />COSTShift basis: 1 per day <br />Cost Breakdown: Scraper Wnrk Team Simnart Fnninment MaintPnnnra Fnrnin rant <br />Total work team cost/hour: 7$ 31.50 <br />MATERIAL OUANTITIES <br />Initial volume: 32,670 CCY Swell factor: 1.125 <br />Loose volume: 36,754 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$100.38 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$235.35 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />1 $731.50 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: 7$ 31.50 <br />MATERIAL OUANTITIES <br />Initial volume: 32,670 CCY Swell factor: 1.125 <br />Loose volume: 36,754 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCFS Cost Esdmating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,5501bs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCFS Cost Esdmating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.