Laserfiche WebLink
Page 36 of 136 <br />SCRAPER TEAM WORK <br />Task description: Haul Subsoil from Berm to Refuse Pile <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 Permit/Job#: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 020 State: Colorado Abbreviation: None <br />Date: 9/6/2013 County: Moffat Filename: C044 -020 <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />COSTShift basis: 1 per day <br />Cost Rreakdown_ Scraper Wnrk Team Cnnnnrt R.nninmPnt MaintonanrP Fn,,;nmanr <br />Total work team cost/hour: 7$ 31.50 <br />MATERIAL OUANTITIES <br />Initial volume: 35,212 CCY Swell factor: 1.125 <br />Loose volume: 39,614 LCY <br />Source of estimated volume: Page 2.05.5 -18Ra <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 <br />Adjusted Capacity: 29.00 <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$100.38 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$235.35 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />1 0 <br />0 <br />Group Subtotals: <br />Work: <br />$731.50 <br />Support: <br />$0.00 <br />1 Maint: <br />$0.00 <br />Total work team cost/hour: 7$ 31.50 <br />MATERIAL OUANTITIES <br />Initial volume: 35,212 CCY Swell factor: 1.125 <br />Loose volume: 39,614 LCY <br />Source of estimated volume: Page 2.05.5 -18Ra <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 <br />Adjusted Capacity: 29.00 <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />