Laserfiche WebLink
4 <br />• Dr"\,~F ,,~,y , <br />i <br />h:X1116I'f D <br />M1NIiJC PLAN <br />hfining operations will be conducted by First stripping the :u-ra with <br />dragline, loaders, dozers, and other conventional earth-moving <br />equipment. Dredging ponds will be .uprned iuiLia.ily by the use of <br />dragl..ines to ^bCai.n floating area for n dredge. Drcdg.ing will be <br />conducted with an six to twelve inch convention a. gravel dredge presently <br />owned or to Ue purcha:=od. screens, bins and dewateri.ng equipment <br />will be locaCed on shore-side facilities. Dewatering shall be conducted <br />in the following m;nuier; a holding, pond will he excavated in the area <br />to be mined and waste water will be pumped into the pond so waste fines <br />will settle. The pond will have an overflow Elowing into Che ache l.a <br />Pourde River. The operator has applied for ;« National Pollutant <br />Discharge lil.iminati.on System Pern«it. All maCerials dredged mri excavated <br />will br_ used in the production of the mining operation, so there will <br />be no waste products generated from the dredging operation. <br />During the years ].977-1981, 10 'acres will be worked. During the years <br />1981-1984, 8 acres will be worked. During Che years 1984-1987 9 acres <br />will be worked. <br />No excavation shall be permitted within ten feeC of any boundary line. <br />The extraction area will be fenced and enclosed as required by lJeld <br />cennty. <br />MINING TIMETABLE <br />/S <br />Phase 1 will begin in 1978, starting of the den acre pond. <br />` I d. , <br />P*as~2 ~ 3 w+\\ be 5~q,.}ed q~ n ~n~et~a~~ , Rec~ar„a~,o«. o~ P1~ase Z ~ 3 ~'Q'lIre <br />Completion date is estimated to be 1987. Phan 4nP wtl>, ~ 2, <br />1~<rm+'~~d a~' a~eY <br />EXHIBIT E volt. <br />RECLMIATION PLAN <br />The reclaimed land will be used as priviate fishing ponds ctnd as an <br />area for ducks and other waterfowl to land. Reclamation will be three <br />ponds, the Easterly one, ten acres, the Southerly one, eight acres, <br />the ldesterly one, nine acres. The ponds will have a sloped bank no <br />steeper than 2:1. They will have a depth of approximately thirty <br />feet. .The area of the banks and between ponds will be restored. <br />Preservation shall be made of existing trees and vrgatation along <br />the Cache La Poudre River, so as to preserve that ,area for cover and <br />wildlife use. Total affected land area is forty acres more or :Less. <br />