Laserfiche WebLink
• ~~ r <br />• <br />DATE ,.~„ ~~, ~ <br />L'XHIBIT D <br />MINING PLAN ~• <br />Mining operations will be conduct8~'by first stripping the area with <br />dragline, loaders, dozers, and other conventional earth-moving <br />equipment. Dredging ponds will 6e opened initially by the use of <br />draglines to abtain floating area for a dredge. Dredging will be <br />conducted with an six to tcaelve inch conventional gravel dredge presently <br />owned or to be purchased. Screens, bins and dewatering equipme:t <br />caill be located on shore-side facilities. Decaatering shall be ~=onducted <br />in the following manner; a holding pond will be excavated in the area <br />to be mined and waste water will be pumped into the pond so waste fines <br />will settle. The pond caill have an o~serflow flowing into the C:iche La <br />Pourde River. The operator has applied for a National Pollutant: <br />Discharge Elimination System Permit. All materials dredged and excavated <br />will be used in the production of the mining operation, so therE~ will <br />be no waste products generated from the dredging operation. <br />During the years 1977-1981, 10 acres will be worked. During thc~ years <br />1981-1984, 8 acres will be worked. During the years 1984-1987 9 acres <br />will be worked. <br />No excavation shall be permitted within ten feet of any boundary line. <br />The extraction area will be fenced and enclosed as required by [Feld <br />County. <br />PIINING TIMETABLE <br />Phase 1 will begin in 1978, starting of the ~ n acre pond. <br />-v_ ._, , <br />_1--__ _ __ _o __ _ { 1~1R1 t~-w `~.-_.~r-la~ci ola.r~~_ m_n fd. <br />P~~sc2 f(3 w,~~ bQ s~a.Sted a~ 4 ~a~•rda~e.. Rec~aw+2~.on o~ CF~ase. Z ~ 3 Ore. <br />P}rese 3-mom}-1--§~n ~A~~9&4, - - ~~ ''~~ - -- -~~~-'. discussed ~nf,4.s <br />Completion date is estimated to be 1987. P~4^ 4n~ "'~~( ~'e- <br />I~err~~~~d 4+a~.r <br />EXHIBIT E da~ <br />RECLAMATION PLAN <br />The reclaimed land will be used as priviate fishing ponds and as an <br />area for ducks and other waterfowl to land. Reclamation will be three <br />ponds, the Easterly one, ten acres, the Southerly one, eight acr~zs, <br />the Idesterly one, nine acres. The ponds will have a sloped bank no <br />steeper than 2:1. They will have a depth of approximately thirt:~ <br />feet, The area of the banks and between ponds will be restored. <br />Preservation shall be made of existing trees and vegatation along; <br />the Cache La Poudre River, so as to preserve that area for cover and <br />wildlife use. Total affected land area is forty acres more or less. <br />