Laserfiche WebLink
.~ <br />i <br />• .. -.. • I F. V ~ u Ci :.u f <br />~l~ f L ..N 13 <br />ExlilBtT D <br />r1INING PLAN <br />rl.ining operaCinns wi]L he condtn'CCd by f irrt •'~ti ippi~:;• ;'~~ ~.• ~ .~ilh <br />dragli.ne, loaders, dou•rs, and nt ht r cony, ni i• ~~.,i ~ ~~• ~'~ ~n <br />equipment. Dredging ponds will be .opened init i•iI L~• by th~ a•.r of <br />draglines to abtai.n floating area for a dredge. Dredging will be <br />conducted with an six Co twelve inch conventional gravel dredge presently <br />owned or to be purclinsrd. Screens, bins and dewatering equipment <br />will be located on shore-side facilities. DewaCering shall be conducted <br />in the following manner; a holding pond will he excavated in the area <br />to be mined and waste water will he pumped into the pond so waste fines <br />wil,7. seCel.e. The pond will have an o~serflow flowing into the Cache La <br />Pourde River. The operator has applied for ~a National Pollutant <br />Discharge tiliminaCi.on System Permit. A11 materials dredged and excnvai~~~f <br />will be used in the produr_tion of the mining operation, so there will <br />be no waste products generated from the dredging operation. <br />During the years ]977-1981, 10 'acres will be worked. During the years <br />1981-1984, 8 acres will be worked. During the years 1984-1987 9 acres <br />will be worked. <br />No excavation shall be permitted wiChin ten feeC of any boundary line. <br />The extraction area will be fenced and enclosed as required by ldeld <br />County. <br />MlNINC TIMETABLE <br />/S <br />Phase 1 caill begin in 1978, starting of the Een acre pond. <br />l ` `~(` d , <br />P^15CZ ~i 3 will b¢ S+art~ o.'T a ~a~era..~e • R¢c~wmQ~.on o~ P4~1ase Z ~ 3 a.a <br />, acirporra-• Qig cussed <br />Completion date is estimated to be 1987. Phan a^~ `"'i{`~,~;Z, <br />Vie r m ,'~ra a} g 1~ e Y <br />EXHIBIT E C~n~C. <br />RECLAAfATION PLAN <br />The reclaimed land will be used as priviaCe fishing ponds and a, an <br />area for ducks and other waterfowl to land. Reclamation will he three <br />ponds, the Easterly one, ten acres, the SouCherly one, eight acres, <br />the Westerly one, nine acres. The ponds wi.l.l have a sloped banl: no <br />steeper than 2:1. They will fiave a depth of approximately thirty <br />feet. The area of the banks and between ponds will be restored. <br />Preservation shall be made of existing trees and vegatation along <br />the Cache La Poudre River, so as to preserve Chat area for cover and <br />wildlife use. Total affected land area is forty acres more or less. <br /> <br />