Laserfiche WebLink
-~- <br />EXHIBIT C <br />' MINING PLAN: <br />' 1. The commencement date will be as soon as the permit <br />for this operation is received. The closing date is <br />indefinite but will depend on the amount of mineral reserves <br />available. <br />2. Soil 8 inches to 12 inches deep will be salvaged <br />for use in revegetation during the reclamation process. <br />' ' 3. Any waste rock removed will be used on road sides. <br />' L'l`•VI 4. The clay deposit averages 19 inches in depth. <br />c~ 5. The access road to the mining site is a one-lane <br />graded road previously used by the landowner to get to the <br />1 windmill. <br />6. The dimensions of the excavation area are 580 feet ~~~ <br />' East and West and 733 feet Nort an South for a total of ~,,,.G• <br />425,140 square feet. - ~• <br />7. The existing road is 20 feet wide and 1/4 mile <br />long. This road was graded by a landowner prior to the <br />mining operation. There will be no new roads constructed <br />and no improvements necessary on the existing road. <br />' S. No water will be used in conjunction with this <br />mining operation. <br />9. No ground water or surface water will be <br />~ encountered. <br />' ~1 <br />~~ 10. Colorado water laws and regulations are not <br />applicable to this site. <br />' 11. No refuse or acid-forming or toxic producing <br />materials will be exposed during mining. <br />' 12. Work will be contained to the permitted area. <br />There should be no off-site damage. After reclamation the <br />area should be usable as rangeland once again. <br />' 13. It will not be necessary for the clay to be <br />processed on-site. `~ <br />' ~~ <br />CJ <br />1 <br />