Laserfiche WebLink
<br /> -8- <br /> <br /> EXHIBIT D <br /> <br /> RECLAMATION PLAN: <br />' Attached is the Reclamation Plan prepared by the Baca <br /> County Soil Conservation Service. This plan will be <br /> followed by the operator. <br /> <br /> The estimated costs to reclaim the mining site are: <br />' Backfilling: <br /> 1 loader - 12 hours $ 420.00 <br />' 1 dozer - 12 hours <br />2 men - 12 hours 420.00 <br />196.00 <br /> 3 trucks - 10 hours 750.00 <br /> 3 men - 10 hours 195.00 <br />' T <br />S <br />li <br />il A <br />ti <br /> op <br />on: <br />o <br />pp <br />ca <br /> 1 loader - 10 hours 350.00 <br />' 1 man - 10 hours 65.00 <br /> Seeding: <br />' <br /> 1 tractor and <br /> grass drill - 4 hours 100.00 <br />~, ' 1 man - 4 hours 26.00 <br /> Mulching: <br /> 2 trucks - 10 hours 250.00 <br /> 1 loader - 10 hours 350.00 <br /> 3 men - 10 hours 195.00 <br /> tt <br />M <br />i <br />i <br />t f <br />T <br />B <br /> rom <br />wo <br />es: <br />ov <br />ng equ <br />pmen <br />u <br /> 1 semi and lowboy <br />' trailer - 2 1/2 hours 87.50 <br /> 1 man - 2 1/2 hours 16.25 <br /> 1 loader to site - 1/4 26.25 <br />' 1 dozer to site - 1/4 26.25 <br /> 1 loader to top soil <br /> site - 1 1/2 hours 52.50 <br />' Grass seed 100 <br />00 <br /> . <br />' TOTAL $ 3,625.75 <br /> + 15.8% 572.86 <br />' GRAND TOTAL $ 4,198.61 <br />1 <br />