Laserfiche WebLink
PART I <br />Page S <br />Permit No. COR-040000 <br />A. COVERAGE UNDER THLS PERMIT (cont.) <br />• c. Individual Permit Required: If, after evaluation of the application (or additional information, such as the <br />SWMP), it is found that this general permit is not applicable to the operation, then the application will be <br />processed as one for an individual permit or a more appropriate general permit. The applicant will be notified <br />of the Division's decision to deny certification wader this general permit. For as iadividtaal permit, additional <br />information may be regntsted, and Igo days will be required to process the application and issue the pennit- <br />Temporary coverage under this general permit will be allowed until the individual perarit goes into effect. <br />d. T®apotary Coverage: Notwithstanding Parts I.A.4.ao, above, the Divisiam reserves the right to temporarily <br />aatthorve stormwater discharge from mining activity under general permits, even though individual permit <br />coverage may be more appropriate. <br />Certification of these activities tinder a general permit does not in any way infringe on the Division's right to <br />revoke that authorization and issue en individual permit or antmd en existing individual permit. <br />e: General vs. Individual Permit Corsage: Any owner or operator autirorved by this permit may request to be <br />excluded from the coverage of this permit by applying for an individual CDPS permit. The owner or operator <br />shall submit an individual application, with reasons supporting the request, to the Division at least I80 days prior <br />co any discharge. <br />f. Local Ag®cy Authority: This permit does not preempt or supersede the sudtority of local agencies to prohibit, <br />restriM, or control discharges of stormwater to storm drain systems or other water courses within their jurisdiction. <br />5. Individual Permit Criteria <br />• Aside from the operation type, the Division may use other criteria in evaluating whether an individual permit is required <br />instead of this general permit. This information may come from the application, SWMP, or additional information as <br />requested by the Division, and includes, but is not limited to, the following: <br />a. the quality of ffie receiving waters (i.e:, the presence of downstream drinking water intakes or a high quality <br />fishery, or for preservation of high quality water); <br />b. the type of mining operation, including pollution potential; <br />c. the volume and type of materials handled; <br />d. the size of the facility; <br />e. evidence of noncompliance under a previous permit for the operation; <br />f. the use of chemicals within the stormwater system. <br />In addition, an individual permit may be required when the Division has shown or has reason to suspect that the <br />storntwater discharge is a significant contributor of pollutants to waters of the State. <br />6. Permit Expiration Date <br />Authorization to discharge under this general permit shall expire on September 30, 1996. The Division must evaluate <br />" ` . „...; ; and reissue this general permit once every five years and must recertify the applicant's authority to discharge under the <br />~ :. - general permit at such time. Any permittce desiring continued authorization under the general permit must reapP1Y by <br />'' .~ ~ ~~ March 31, 1996. The Division will determine if the applicant may continue to operate under the terms of the general <br />- permit. An individual permit will be required for any facility not reauthorized to discharge under the reissued general <br />permit. <br />B. SfORMWATER MANAGEMENT PLAN -ACTIVE MINES <br />• A Stormwater Management Plaa (SWMP) shall be developed for the portion of each facility covered by this permit. The <br />SWMP shall be prepared is accordance with good engineering practices. (1Tte plea need not be completed by a registered <br />engineer.) <br />