Laserfiche WebLink
Mr. Thomas Schreiner ~~~ <br />February 9, 2001 <br />Page 2 <br />6.4.7 Exhibit G -Water Information <br />3. Hall-Irwin Corporation will commit to not exposing groundwater or using surface or <br />groundwater until all required OSE approvals have been secured. <br />6.4.8 Exhibit H -Wildlife Information <br />4. Please refer to attached wildlife report prepared by Savage and Savage. <br />6.4.12 Exhibit L -Reclamation Costs '~+ <br />5. Please refer to attached reclamation cost estimate. j-/~~~~~iJ-~~ !~ <br />~~~~~ ~, ~ ~.~~` f~,; <br />6.4.19 Exhibit S -Permanent Man-Made Structures ~ ~O~~i~~-- ~ r"~ /~J <br />L~ <br />6. Hall-Irwin will commit to marking the underground utilities and esta lishing the setback lines <br />on the ground prior [o mining. ' ~y <br />,r.~"M <br />7. Please refer to attached design. Pease note, I have also included a revised stability analysis <br />because we have altered the mining plan on th~wall of phase 1. The operator will <br />mine this area at a 3:1 slope rather than a vertical slope. <br />Please call me if you have any further questions. Thank you for your assistance. <br />ULTANTS, INC. <br />Danna Ortiz <br />Natural Resources Planner <br />Attachments <br />cc: Jeff Gregg, Hall-Irwin Corporation <br />H:~A636_056VN LRB~D MGResponse.wpd <br />