My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105419
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:23 PM
Creation date
11/24/2007 12:17:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981148
IBM Index Class Name
Permit File
Doc Name
CONVERSION AND AMENDMENT OF A MINED LAND RECLAMATION PERMIT
Section_Exhibit Name
EXHIBIT A
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' EXHIBIT D (Cont'd) <br /> <br /> The majority of the area in Stage 7 will have been mined <br /> previously in Stages lA, 2A a nd 3A. Stage 7 will level the <br /> pit floor with a south slope from an elevation of 59001 feet <br /> <br /> on the north to 58801 feet on the south. <br />Stage 8 will be approximately sixty percent newly- <br />disturbed area. About forty percent of Stage 8 will be the <br />final cut on the north end of Stages lA, 2A and 3A. The north <br />Y and east perimeters of the pit will be mined in Stage 8. <br />°]1 Slopes will be maintained at 2 to 1. The east slopes will be <br />backfilled to 4 to 1; however, the 2 to 1 slopes along the <br />north pit perimeter will remain as mined. <br />After Stage 8 is completed, all subsequent mining will <br />occur on undisturbed land. The established stripping and <br />mining pattern will be followed to completion~of Stage 14. <br />Except in Stages 0, lA, 2A and 3A, all topsoil and over- <br />burden will be used to reclaim the previous stage. The <br />majority of the topsoil and overburden in Stages lA, 2A and <br />3A was removed from the affected land prior to enactment of <br />the statute. Most of this material was pushed over the edge <br />r of the hill and was lost. The topsoil and overburden that <br />1 remains will be put into Stockpile Area 2 (Map Exhibit•D-1). <br />I There will be an insufficient amount of topsoil from Stages lA, <br />2A, 3A and 7 to reclaim Stage 6; therefore, a portion of the <br />topsoil from Stage 6 will be stockpiled on the west edge, and <br />the remainder will be used to reclaim Stage 5. After Stage 6 <br />is mined, the topsoil from the stockpile on the west edge of <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.