.. <br />I EXHIBIT D (Cont'd) <br />Stage 6, soil salvaged from Stage 7, and the topsoil in <br />Stockpile Area 2 (Map Exhibit D-1) will be spread over the area <br />of Stage 6. Stage 7 will be reclaimed with material stripped <br />from Stage 8, and Stage 8 will be reclaimed with material <br />stripped from Stage 9. As mining is completed in each stage <br />' of Stages 8 through 14, the east 2 to 1 slope will be <br />brought down to a 4 to 1 slope. The topsoil from this addi- <br />tional area will be removed and (1) stockpiled in the area <br />between the pit wall and the boundary of the affected land and <br />subsequently spread over the 4 to 1 slope, or (2) will be used <br />to reclaim the area mined previously. <br />Stage 14 will be reclaimed with material from Stockpile <br />Area 1 (Map Exhibit D-1). All perimeter slopes along the <br />eastern side of the pit will be mined at 2 to 1 and will be <br />sloped to 4 to 1 during reclamation. <br />The pit will operate year-round on a demand basis. When <br />clay or sand is required by the brick plants, the material <br />will be removed from the stockpiles at the mine. As the stock- <br />piles are reduced, new stockpiles will be created with mined <br />materials. <br />The clays to be mined lie in almost vertical veins which <br />are interbedded with sands which are unsuitable in large <br />volumes for the manufacture of brick. The clay veins lie <br />between 70 and 80 degrees from horizontal. The majority of <br />the unsuitable sands will be excavated and used to reclaim the <br />-13- <br />