My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105117
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:10 PM
Creation date
11/24/2007 11:54:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
Permit File
Doc Date
9/29/1977
Doc Name
APPLICATION FOR MINING AND RECLAMATION PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAh1ATI0N PLAid <br />• Plan 7 <br />The Plan consists basically of three phases: <br />1. Site preparation: backfilling, grading, dozing, ripping, <br />plant media application at 15-35cm depth, manure applications <br />(at various rates the first few years until comparisons are <br />made of seedling vigor) mulch applications, (different types <br />and rates)---One field season. <br />2. Seedling and native transplanting: two field seasons, in- <br />cluding mulch applications and systems maintenance. <br />3• Systems maintenance, including weeding, fertilizer applica- <br />tions if needed, remulching, watering---two field seasons after <br />inital transplanting. Systems maintenance experimentation will <br />involve the operation of a drip irrigation system on one-fourth <br />to one-third of the first season transplants, so that survival <br />rates and seedling vigor can be compared with the increased cost <br />of operation of such a system. <br />This mode should result in a self-sustaining vegetative cover on the <br />affected land within the fourth or fifth year after reclamation efforts <br />• commence. All three phases of the plan will be in effect in some area of <br /> the mine at any given time after 1980, enabling data accumulation to im- <br />prove reclamation techniques and reduce costs as the program continues. <br />In May, 1977, more than 700 yards of manure was hauled to the mine site. <br />Along with dozer work the preceeding months, this initiates phase one of <br />the Plan in two areas, Dagazine Hill and Gillespie Hill (see Plan Time- <br />table). The following is a list of acreages in each area: Location may <br />be found by reference to the hfine Plan Map or the Reclamation Plan Map, <br />Exhibits C and F. <br />Gillespie Hill 14.1 acres <br />Magazine Hill 17.0 acres <br />Senatore Hill 10.7 acres <br />Gold Hill 13.0 acres <br />Copper Hill 25.0 acres <br />Roads, Shop Area, Ect. 13.9 acres <br />• Total Affected Land 93.7 acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.