Laserfiche WebLink
D. EARTHWORK -FILL COMPACTION <br />TASK No. Task Description <br />• N/A <br />E. EARTHWORK -RIPPING <br />TASK No. <br />n <br />U <br />Task Description <br />6 Rip regraded Spoil Prior to Topsoil Replacement <br />7 Rip Haul Road Material 3' Deep <br />8 Rip facility Area <br />25 Rip Perimeter Road Material 3' Deep <br />F. EARTHWORK -ROAD RECLAMATION <br />TASK No. Task Description <br />9 Remove Ripped Surfacing Material & Haul to Pit <br />10 Remove 2700/BB road Detour <br />10B REPLACE BB-ROAD WITH PAVEMENT <br />26 Remove ripped Material from Perimeter road& Haul <br />G. EARTHWORK -FINISH GRADING <br />TASK No. Task Description <br />11 Final Grade Disturbed Areas -include in B&G <br />subtotal (Dl <br />Cost ($) <br />i:4 <br />Cost ($) <br />$5,617 <br />$4, 594 <br />$8,482 <br />$2,474 <br />subtotal IEl 2 167 <br />Cost ($) <br />$21,387 <br />$45, 500 <br />$119,375 <br />$27,183 <br />subtotal 1F1 5213.445 <br />Cost ($) <br />$5,932 <br />subtotallGl $5.932 <br />F:\ENG\DATA\W P\2000 PERMIT-APP ROVED\BON DB.OPW <br />