Laserfiche WebLink
Western Fuels-Colorado <br />Reclamation Cost Summary Form <br />. PERMIT NUMBER: C-81-008 PREP. BY: ROSS L. GUBKA, P.E. <br />Date: 26-JAN-01 OPERATION: NEW HORIZON MINE #2 <br />GRAND TOTAL OF BOND AMOUNT: 52.236.905 <br />I. DIRECT COST <br />A. EARTHWORK - BACKFILLING $ ROUGH GRADING <br />TASK No. Task Description Cost ($) <br />1 Haul Boxcut Material from Stockpile to Pit $356,898 <br />2 Grade Boxcut Material Placed in Pit $33,352 <br />3 Grade Existing Spoil Piles $1,007 <br />4 Remove Matrial from Facility Area $ Haul to Pit $30,089 <br />28 Grade Pit Turn Slot Cut Highwall Material $10,349 <br />29 Grade Backfilled Material associated w/Pit Turn $85,404 <br />31 Haul Fill From Borrow Area To Pits $545,155 <br />• subtotal IAI 57.062.254 <br />B. EARTHWORK - HIGHWALL REDUCTION <br />TASK No. Task Description Cost ($) <br />5 Highwall Reduction $4,895 <br />27 Rip Hightwall Associated wlPit Tum Slot Cut $2,656 <br />subtotal (BI 57.551 <br />C. EARTHWORK -WASTE PILE COVER PLACEMENT <br />TASK No. Task Description Cost ($) <br />N/A <br />subtotal (CI $Q <br />F:1ENG\DATA\ WP12000PERM IT-APPRO V EDIBON DB.OP W <br />