Laserfiche WebLink
H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />TASK No. Task Description Cost ($) <br />• 12 Reconstruct Drainage $1,218 <br />subtotal (Hl E1.278 <br />I. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />TASK No. Task Description Cost ($) <br />13 Removal Pond 009 $6,897 <br />14 Remove Diversion Ditches $479 <br />subtotal !II 7 3 <br />~ARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />TASK No. Task Description Cost ($) <br />15 Replace Topsoil; Facility, Spoil Base, Pond 007 8 $40,841 <br />Haul Roads <br />16 Replace Topsoil on FinalPit Area $84,613 <br />30 Replace Topsoil on Pit Turn Slot Cut $20,007 <br />subtotallJl $145.461 <br />K. PORTAL/SHAFT SEALING <br />TASK No. Task Description Cost ($) <br />18 Spoil Sampling(assume 10 samples/$200 each) $2,000 <br />19 Rill & Gully Repair $10,000 <br />20 Construct, Maintain 8 Operate Flood Irrigation $12,000 <br />• subtotal(Kl 24 000 <br />F:\ENG\DATA\WP\2000PE R M IT-APPROVED\BON DB.O PW <br />