Laserfiche WebLink
• <br />-15- • <br />Ward: What's the general slope of the site? <br />Drell: The .existing slope? It's almost flat, it's upraised and it's <br />quite level. <br />Ward: What's the kind of topsoil depth, what are we talking about there? <br />Drell: Two feet approximately. The topsoil overburden is approximately <br />2 feet, and the gravel is approximately 8 feet, and when it will <br />be mined the slope will be three-to-one when they're finished. <br />Ward: Did you dig any of the soil, has that been done so you know a little <br />bit, anything about the texture or anything? <br />Drell: I can go through the soil concentration report and tell you what <br />their findings were, but (I) other than that.... <br />Ward: What did they say about topsoil in general terms. <br />Drell: For what they want to do with it, they say generally that it's a . <br />good source of topsoil and they don't foresee any problems. They <br />say that it should be tested at the time of reclamation to see <br />what, if any, fertilizer would be needed there. Other than that <br />they.... <br />Ward: So they made a general survey of it, and they didn't give (is there) <br />any evidence of profile and structural considerations there? <br />