Laserfiche WebLink
<br />BSCLAMATIDB PLAN <br />B%9IBIT D (Cont'd) <br />Page Two <br />8. Specify any ponds, streams, roads and buildings that will <br />remain after reclamation: Devil Creek will remain far east of <br />the pit, then a dike. The pit will become the pond. Other <br />than water fowl nesting boxes, there will be no buildings. <br />The access will stay. <br />9. Reclamation treatment of hydrologic balances: When <br />reclamation is completed, the water level will be 1-2' below <br />the meadows raising the water table 1-2'. <br />The ponds will therefore be part of sub-irrigation system. <br />10. Financial warranty: As the goal of this mining operation is <br />the ponds and the only disturbance outside the pit will be a <br />175' road and a small area without topsoil to store the last <br />of the sand on the last Phase IV, which will become part of <br />reclamation as a lake, I ask that the financial warranty be <br />waived. <br />1 <br />