Laserfiche WebLink
<br /> <br />S%HIBIT D <br />EECLANATION PLAN <br />Page Three <br />ESTIMATE OF COST TO EECLAIN SITE <br />Cost <br />1. Backfilling <br />2. Grading <br />3. Topsoil application: 430' of <br />northwest corner of pit <br />4. Seeding <br />5. Mulching - old hay <br />6. Fertilization 10-20-10 <br />Labor <br />None needed <br />Done as gravel is dug <br />30 yds. $100.00 <br />50 lbs. $113 $100.00 <br />Free 25.00 <br />200 lb. $40.00 25.00 <br />Total $250.00 <br />