My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104222
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:31 PM
Creation date
11/24/2007 10:55:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pg RN 780-1-1 to 780-228-2
Section_Exhibit Name
RN Part 780 RECLAMATION & OPERATIONS PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil replacement and revegetation will follow recontouring as described <br />(see pages 780-107-1 and 780-117-1). <br />• In order to facilitate the backfilling of the Area 61 pit it is necessary to <br />construct a walk back around the southern end of the pit. The permit <br />boundary in Section 9 has been modified to allow this activity. The new <br />permit boundary description is as follows: T4N, R86W, Section 9 - W1/2 <br />NW1/4, SE1/4 NW1/4, W1/2 SW1/4, NE1/4 SW1/4, and N1/2 SE1/4 <br />SE1/4. Prior to this revision the permit boundary had the following <br />description W; NW}, SE} NW}, N} SW}, SW1 SW}. All descriptions are to the <br />nearest quarter quarter section. The revised permit boundary is shown on <br />Permit Renewal Map Nos. 1, 2 & 5. <br />The walk back road will require removal of topsoil from the area and <br />leveling of the road surface. The topsoil will be bladed to the side of the <br />area and stockpiled temporarily. The topsoil will be ripped and then <br />salvaged to a depth of approximately 20 inches. Approximately 2700 CY of <br />topsoil will be stockpiled, with approximately 1/3 of this yardage placed in <br />the NE stockpile and 2/3 in the SW stockpile. After the dragline uses the <br />• road the topsoil will be redistributed over the site. The dragline <br />walkback road corridor will be approximately 200 feet wide. <br />The levelling will require minor cut and fill work, with the maximum cut <br />approximately 5 feet in depth. The cut slopes will not be steeper than <br />1.5H:1V. Drainage from the area will be directed back to the Area 61 pit, <br />or into the watershed serviced by Pond A. When the road is reclaimed the <br />site will be graded so it blends in with the surrounding topography. <br />The topsoil replacement will occur either in February or March, 1990 or <br />after mid July, 1990. Equipment and weather will dictate the topsoiling <br />schedule. Given the short stockpile period the topsoil will be as live <br />handled topsoil and will not require seeding. <br />• <br />TR 90-29 Permit Renewal 780-1-3 Revised 04/11/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.