All topsoil removal is complete with the exception of removal which may be <br /> required by future revisions and modifications. <br />• <br />The method of live handling as approved on April 8, 1985 and modified as of <br />October 17, 1985 consists of the following. <br />Prior to topsoil removal, all vegetation that would hinder topsoil removal <br />is treated with the Madge Rotoclear pulled by a dozer as approved December <br />4, 1981. The topsoil is then removed with scrapers and immediately <br />deposited on regraded spoil. Soil is removed in 2 separate lifts. The <br />first lift consists of 16-18 inches in rotocleared areas and 10-12 inches in <br />non-roto-cleared areas. The remaining topsoil is picked up in the second <br />lift. These 2 lifts are then laid down in the reverse order so that the top <br />layer remains on the surface in the reclaimed area. After replacement, the <br />surface is graded and contour furrows constructed. The site is then left <br />alone to rely on the natural processes of seed germination and root <br />sprouting to revegetate the site. <br />• PiR 89-36 Permit Renewal 780-107-3a Revised 04/24/89 <br />