The segment of the access road that will be constructed on spoil will use the <br />• spoil as surfacing material. The segments of the aooe~.s toad that are not <br />constructed on spoil will use the native soils as surfacing material. <br />The crossing of the southern tributary of Foidel Creek will consist of two 36- <br />inrh diameter culverts. In the event that topsoiling activities utilizing <br />stockpile 26/27-51 are not oac~leted during 1989, then the culverts will be <br />removed and reinstalled following the 1990 run-off period. Approximately five <br />feet of fill material will be placed over the culvert. The fill material will <br />be borrcx~ed from either side of the culvert as it is positioned across the access <br />road. This material will be pushed up to and over the culvert. 'Typically, the <br />road will be approximately 100 feet wide, however, on the slope down from the <br />stoclq~ile it will be approximately 160 feet wide. The road s«iment on the slope <br />will be a cut and fill section to allow for a level runnvxJ surface. All the <br />topsoil will be salvaged from the cut and fill area. A work area will be <br />maintained around the stockpile to facilitate loading of trucks. The mad will <br />be used by the various equipment utilized in the topsoiling project. This <br />includes trucks, scrapers, aid other mobile equipment anti support vehicles. <br />• <br />'The road will follow the existing powerline road, except for that segme~lt from <br />the top of drainage over to the topsoil stocig~ile. For the road paralleling the <br />powerline, the topsoil will be bladed to either side of the road and temporarily <br />stoclq~iled until the project is om~leted. <br />After the topsoiling project utilizing stockpiles 26/27-51 has been ca~leted, <br />the access road will be reclaimed. Prior to removal of the culvert, the fill <br />material will be redistributed. the road and fill material will be regraded to <br />blend in with the ~u-r~*~?Tlg topography. 'The stockpiled or windrow topsoil <br />will be redistributed over the road, and the area will be seeder with the <br />pastureland seed mixture. Likewise, the vacant area of the topsoil stockpile <br />will be seeded with the pastureland seed mixture. <br /> <br />MR 90-54 Permit Renewal 780-107-1(a) Revised 07/16/90 <br />