My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />ROJECT IDENTIFICATION <br />Task # : 010 State :Colorado Permitfjob # : C-96-083 <br />Date: f0/f512006 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 2 Mine Filename : C083-010 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewa102 <br />Task description :pull Material Back Onto Train Loadout Facilities and Railbed Benches <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 3658 L Series 11(2005) Horsepower : 404 <br />Weigh (MT) : 70.25 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $73.40 NA Shift basis : 1 perday <br />Operating cosUhour : $f 09.03 100 Data source : (CRG) <br />Operator cosUhour : $32.72 NA <br />Total unit cosUhour : $215.14 Total fleet cosUhour : $430.29 <br /> <br /> <br /> <br />ATERIAL QUANTITIES _; .: <br /> <br />< <br />>:. <br />,, ,.. <br />>;; <br />, <br />Initial Swell Loose <br />volume : 231,495 LCY factor : NA volume : 231,495 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION . <br />Excavator Cycle Time (load bucket swing loaded, dump bucket. swinc em <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.57 minutes <br />Bucket Caoacity <br />Rated bucket capacity : 3.27 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Haul, tough clay (80% - 90%) <br />Adjusted bucket capacity : 2.78 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5,900 feet Altitude adjustment : 1.00 ~ (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shiH/day) <br />Net job correction : 0.83 multiplier <br />Unadjusted houdy unit production : 292.58 LCY/hour <br />Adjusted hourly unit production : 242.84 LCY/hour <br />Adjusted hourly fleet production : 485.68 LCYfnour <br />;. <br />:.: ; <br />JOB 71ME AND COST <br />Fleet size : 2 excavator(s) Total job time : 476.64 hours <br />Unit cost : $0.886 per LCY Total job cost : $205,093 <br />
The URL can be used to link to this page
Your browser does not support the video tag.