My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 009 <br />Date : 10/13/2006 <br />User: JRS <br />Permitfob# : C-9$-0$3 <br />Abbreviation :none <br />Filename : C083-009 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description :Regrade New Truck Loadout and Coal <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Utilization <br />sUhour: <br />sUhour: <br />sUhour: <br />sUhour: <br />sUhour: <br />Swell Loose <br />factor : 1.165 volume : 79,127 <br />volume: 67,920 CCY <br />$777.82 <br />LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Ownership ce <br />Operating co <br />Ripper op. co <br />Operator ce <br />Total unit co <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 50% Rock. <br />0.00 % Q <br />6,000 feet <br />2, 900 Ibs/LCY <br />$56.94 NA <br />$104.98 100 <br />$0.00 0 <br />$32.53 NA <br />$194.45 Total fleet cosUhour <br />Job Condition Correction Factors <br />Operator skill ; <br />Material consistency :_ <br />Dozing method <br />Visibility :_ <br />Job effciency :_ <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.79 <br />1.00 <br />0.36 <br />50% Earth <br />Source <br />Adjusted unit production : 441.76 LCY/hr <br />Adjusted fleet production : 1,767.04 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 44.7$ Hours <br />Unit cost : $0,440 /LCY Total job cost : $34,830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.