My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CiRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task p : 011 <br />Date : 10/13/2006 <br />User : JRS <br />Permitfob# : C-96-083 <br />Abbreviation :none <br />Filename :C083-011 <br />Agency ar organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description : Regrade Train Loadout Facilities and Railbed Benches <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $56.94 NA <br />Operating cosVhour : $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $194.45 Total fleet cosUhour : $7]7,82 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 231,495 LCY volume <br />231,495 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description ; <br />Consolidated stockpile <br />Average push gradient : 5.00 % ({ <br />Average site altiiude : 5,900 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 9 Dozers) <br />Unit cost : $0.779 /LCY <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />factor <br />NA <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.36 <br />Adjusted unit production : 249.72 LCY/hr <br />Adjusted fleet production : 998.88 LCY/hr <br />Total job time : 231.75 Hours <br />Total job cost : $180,262 <br />Horsepower: 405 <br />HB) <br />
The URL can be used to link to this page
Your browser does not support the video tag.