My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103828
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:15 PM
Creation date
11/24/2007 10:28:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 7 NPDES PERMIT INFORMATION PART 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PART I <br />Page 8 <br />Permit No. COG-80000 <br />8. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stormwater Manaeemenc Plan (continued) <br />• <br />d) The plan shall include a list of oersonnel directly responsible <br />for stormwacer management. The plan shall describe the procedures <br />to be followed for personnel to judge compliance with the SWMP. <br />e) The plan shall provide for proper crainine of affected employees <br />in techniques and procedures that will assure achievement of all <br />stated goals. <br />f) The permittee shall amend this plan at any time if there is a <br />change in operation that will or may result in a deterioration in <br />the quality of pollutants addressed by this plan, or if the plan <br />is shown to be ineffective in achieving the specified goals. A <br />copy of the amended plan shall be submitted to the Division and <br />the CMLRD within 70 days, along with an explanation of the reason <br />for the amendment. If the Division finds the amended plan to be <br />inadequate, or if the procedures established are shown to be <br />ineffective once in place, the permittee shall develop and employ <br />new procedures. <br />g) The permittee shall submit arnuai :eoorts due on the anniversary <br />date of the specific facility certification. Each report shall be <br />signed and certified (sae Past I.C.6.) and shal'_ include a <br />statement affirming that a thorough inspection of all affected <br />operations covered under this plan has occurred at least once per <br />quarter during the period covered by the report. if the <br />inspection detects complete conformance with the plan, this shall <br />be so stated. If the inspection shows the plan co be <br />inappropriate or ineffective in any area, the annual report shall <br />address how the permittee has corrected or intends co correct this <br />deficiency. A11 annual reports shall become a part of this permit <br />by reference. <br />h) Whenever a facility or a portion of a facility enters the <br />most-minine phase, is is likely chac.the overall configuration of <br />the site will change considerably. As che.land is reclaimed, <br />roads, railroad lines and structures will be removed, and <br />significant reshaping of the surface will occur. Prior co the <br />time when new vegetation becomes established, the surface areas <br />will be subject co potentially significant erosion. The permittee <br />will need to cake adequate measures in order to minimize this <br />erosion. Therefore, ac the time of post-mining, the permittee <br />shall amend the plan to include specific procedures to minimize <br />erosion and ocher factors that contribute to the discharge of <br />total suspended solids and ocher pollutants from newly reclaimed <br />areas, A copy of the amended plan shall be submitted to the <br />Division and the CMLRD wick the amendment request co change from <br />active co post-mining requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.