Laserfiche WebLink
PART I <br />Page 7 <br />• Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Scormwacer Manaeemenc Plan (continued) <br />In the areas of coal mining facilities directly regulated by effluent <br />limitations, is is expected that, through actions directed ac <br />achieving compliance with these limitations, the permictee will <br />effectively control most site scormwater discharges. However, in <br />ocher areas, this may not be the case. Some of the discharges are <br />outside the coverage of the diversion ditches and sedimentation ponds <br />required under the facility's Colorado Mined Land Reclamation Division <br />(CMLRD) permit. Examples of such areas are roads and railroad Lines <br />used for transportation co and from the site, outslopes of ponds, <br />inactive Loadoucs, sites used for storage and maintenance of material <br />handling equipment and areas granted small area exemptions. <br />The plan shall describe all areas that have not been previously <br />permitted, but meet the definition of a scormwater discharge in 40 CFR <br />122.26, and shall include a map (or maps) denoting the affected <br />areas. The map(s) shall show the location of the discharge(s) or <br />drainage areas and indicate the receiving waters. The map(s) shall <br />label each stormwacer oucfall with a three digit number beginning with <br />the next number after the last number assigned co surface runoff <br />outfalls. <br />• The plan shall describe the controls and/or procedures that <br />specifically address the goal of minimizing or elimiracing the <br />pollution from these scurces. In some cases, this may entail <br />construction of physical facilities. In ocher cases, is may entail <br />developing new methods of operation or material handling and/or <br />replacement of materials with chose that are less polluting. The <br />permictee shall make the appropriate determinations and receive the <br />appropriate approvals from the CMLRD. <br />Where necessary, the plan shall include a schedule eE activities <br />and/or construction with a reasonable timetable for implementation of <br />any new operations or construction of new facilities necessary co <br />achieve the required goals. The time cable shall allow for attainment <br />of operational level as expediently as possible, but in no case after <br />.tune 30 1995, in conformance with Parc 402(p)(4)(A) of the Federal <br />Clean Water Ac c. The Division will ensure that-no proposed timetable <br />is excessively lengthy. <br />Specific Requirements: <br />a) A coov of the plan shall be kept on-site and shall be readily <br />available co all personnel involved with compliance with the plan. <br />b) The plan shall contain a statement of certification, signed by tap <br />• management, supporting compliance with the stated goals. <br />c) Records pertaining to implemeRCacion of the plan shall be kept in <br />a log and made available on request to Division, CMLRD and EPA <br />representatives (see Parc I.C.4.). <br />