Laserfiche WebLink
-~, ~ • PAGE 6 <br />EXHIBIT D - Reclamation Plan <br />1. Description - of how will handle overburden Original stripping to <br />be stockpiled and as pit progresses, the remaining overburden will <br />be used to backfill completed pit area. <br />2. Thickness of top soil to be replaced: <br />The stockpiled topsoil will be replaced to a depth of 1" - 3" as is ~, <br />available. <br />3. Describe gradient of reclaimed slope. <br />3:1 <br />4. Describe seeding operation The seeding, fertilitzer, and mulching will <br />be done in accordance with the recommendation of the Soil Conservation <br />report. Seedbed will be disced. <br />5. Describe grass, forb, shrub and tree specie: <br />Please see Soil Conservation Report attached. <br />6. Describe the application method of seeding <br />Please see Soil Conservation Report attached. <br />~. Describe the mulch: <br />Please see Soil Conservation Report attached. <br />8. Describe any road, streams & ponds that will remain: <br />None <br />9. Describe how any left over rock etc. will be handled. <br />N/A <br />