Laserfiche WebLink
• l n~. a. J <br />E:•;HIBIT C - Mining pla• <br />1. Dates of Mining, beginning and end. <br />Beginning on or about August 1991, ending August 1996. <br /> <br />2. Description of depth of top soil & How stored. <br />Topsoil depth varies from 1" to 6" in affected area, The topsoil that <br />can be removed will be stockpiled as shown on Exhibit E - Map. <br />3. Description of overburden <br />Overburden varies from 0" - 4 Ft thick. <br />4. Thickness of gravel layer. <br />Thickness of gravel layer varies from 5 ft to 20 ft. <br />5. Description of roads to ~ from pit - Show on map - Ex E <br />Access to affected area will be on county roads in the <br />immediate area. See Exhibit E - Map. <br />6. Show disturbance to land surface. <br />Mining Operation will be from East to West <br />T. Show dimensions of existing and proposed roads that <br />will be used. County will use existing haul road into general <br />pit area. Haul road to be reclaimed at completion of pit <br />operation. <br />8. Specify how much water will be used, if any. <br />None <br />9. Describe any ground xater and/or the affect. <br />None <br />10. Describe if will comply with Colorado Water Laws. <br />No surface or subsurface water rights will be affected <br />by the pit operation. <br />11. Describe whether gravel x111 be processed on site. <br />No gravel to be processed on site. <br />