Laserfiche WebLink
<br />EXHIBIT E (Cont'd) <br />' will be commenced. Valco plans to attempt to complete grading, <br />' reshaping, seeding, mulching, fertilizing and planting of seed- <br />ling trees within one year of the completion of each mining <br />' stage. <br />' The usual planting, mulching and fertilising time will <br /> be from April 1 to hiay 15 of each revegetation year. During <br />' the four remaining years of a reclamation phase the reclamation <br /> progress will be monitored and remedial work will be performed <br />' where necessary. <br />' Reclamation Standards. Grading will create a topography <br /> appropriate to the final land use. Backfilling into the lake <br />' will create irregular shore lines with good stability (see <br /> map Exhibit F). As shown on map Exhibit F, sloped areas <br />' will be regraded to 3 to 1 from five feet above the water <br />' line to ten feet below the water line. Other slopes will <br /> be regraded to 2 to 1 as required. This open pit operation <br /> has no drill holes or auger holes remaining and has no <br /> addits or shafts. <br />' There are to be no earth dams. <br />' No toxic or acid-forming material will be encountered <br />or used in the operation. <br />' All refuse will be disposed of by either hauling it <br />away or by properly burying it in the backfill areas so that <br />1 <br /> <br />' 12 <br />