Laserfiche WebLink
J CAMAS Colorado, Inc. • • Page 2 <br />Aggregate Production Facility Slortnwater Management Plan <br />and gravel is conveyed by means of a conveyor belt to the processing plant and <br />subsequent stockpiling. Processing consists of one stage of crushing. Screening <br />allows for different product types to be sorted. Raw and processed aggregate is <br />stockpiled for future sales. <br />Activities at this site which could potentially contribute pollutants to stormwater runoff <br />include the following: aggregate excavation, processing and stockpiling, pumping of <br />fuel for heavy equipment, vehicle maintenance and light repairs, storage of spare <br />parts and equipment, and the storage of lubricating fluids. These activities and the <br />potential pollutants they may contribute to stormwater runoff are discussed in the <br />following sections. <br />