Laserfiche WebLink
Stipulation No. 1 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST <br />t• <br />EITHER SUBMIT A REVISED BACKFILLING AND GRADING PLAN <br />• TO INCLUDE REMOVAL OF THE NORTHERN N0. 1 DIVERSION <br />DITCHES OR PROVIDE SUFFICIENT INFORMATION FOR THE <br />DIVISION TO MAKE A FINDING OF COMPLIANCE WITH THE <br />POST-MINING LAND USE CHANGE REQUIREMENTS OF RULE <br />2.05.5. <br />Northern Coal's Answer: <br />EXHIBIT M-1 OF THE APPLICATION SHOWS THE POST RECLAMATION <br />CROSS SECTIONS FOR THE NOTHERN N0. 1 MINE. THESE REVISED <br />CROSS SECTIONS SHOW THE REMOVAL OF THE DIVERSION DITCHES, <br />WITH THE CREEK NOW BEING PLACED IN THE BOTTOM OF THE <br />VALLEY AS IT WAS BEFORE CONSTRUCTION. THE OLD DITCHES <br />WILL BE GRADED TO CONTOUR, AS IT WAS STATED IN THE BACK- <br />FILLING AND GRADING PLAN SUBMITTED IN THE APPLICATION <br />ON PAGE M-3. <br />r~ <br />..Y <br /> <br />