Laserfiche WebLink
<br />13. Mine the Phase II area. <br />14. As mining progresses, begin backfilling the mine perimeter to establish <br />the 3:1 slope. <br />15. Remove overburden berms when mining is complete and distribute <br />this material over the shale filled pond slopes. <br />16. Distribute stockpiled topsoil over balance of Phase II areas. <br />17. Remove on-site processing equipment. <br />18. Scarify plant site area and replace topsoil over this area. <br />19. Re-seed all completed areas. <br />20. Institute weed management plan, as required. <br />19 <br />