<br />separate the residences on site from the mining operation. <br />4. Replace topsoil over the filled areas around the perimeter of the mining <br />area and seed this area. <br />5. Prepare processing plant site and process water pond system by <br />stripping and stockpiling topsoil. <br />6. Begin mining Phase I. <br />7. As mine areas are progressing begin backfilling mine perimeter to <br />establish 3:1 slope. <br />8. Begin construction of the pond separation berm once this area has <br />been mined out. <br />9. Strip topsoil from the areas around the perimeter of Phase II for the <br />areas slated to be filled. This material will be temporarily windrowed <br />around the edge of the property. <br />10. Strip Phase II topsoil and apply to completed areas within Phase I. <br />Stockpile enough of this material to ensure that enough topsoil is <br />retained to finish Phase II and the separation berm. Any surplus will <br />be sold off-site. <br />11. Remove overburden from Phase II areas and directly apply to fill areas <br />around the perimeter of Phase II and slope areas at Phase I. <br />Excavate dewatering trench and sump #1. <br />12. Replace windrowed topsoil over filled areas around the perimeter of <br />Phase II and seed all completed areas. Excavate Phase II de- <br />watering trench and sump #2. <br />is <br />