Laserfiche WebLink
.. <br />EXHIBTT "E" <br />Reclamation Plan <br /> <br />The material x111 be mined in such a manner as to leave a surface <br />contoured to reflect the natural topography of the surrounding area <br />gently sloping to sloping. <br />Yhen the mining is completed, the area x111 be revegetated. <br />No nex slopes x111 be left steeper than 3~1. <br />The historic land use xas for sand and gravel mining. The future use <br />is for very limited rangelands or possible industrial park. <br />The mining in the area x111 have minor affect on xildlife. Recommendations <br />included in the Wildlife evaluation x111 be folloxed. <br />Revegetation recommendations as outlined Sn Exhibit "J" x111 be folloxed. <br />The seeding and fertilizing specifications are to be included into the <br />construction plans and required within the affected area. <br />tZ LL6YC - .S V1~ FIrC1J6ii141 VII <br />12 days - seeding and mulching <br />Total reclamation time - 3 days <br />Seeding, soil preparation, fertilizing xith manure and mulching for approximately <br />9.72 acres x111 be required first, remaining 19 acres as available and required. <br />Species Variety Rate <br />Indian Ricegrass ---- 12.5 lbs PLS~acre <br />Sand Dropseed ---- 0.5 " " <br />Blue Grams Covington 3.0 " <br />Crested Wheatgrass Nordan 10.0 " <br />Pubscent Wheatgrass Luna 14.0 " <br />Yellox Sxeetclover ---- 7.0 " <br />Mulch Hay or Straw 4,000 lb~acre <br />