Laserfiche WebLink
• PART 3 -RECLAIMED FACILITIES: <br />RECLAIMED FACILITIES: <br />Surface runoff must be controlled in order to maximize longterm stability of the <br />reclaimed facilities. In order to eliminate ongoing maintenance obligations after <br />reclamation, we recommend improved overland drainage but no diversion ditches. <br />All slopes should be completely revegetated to increase their long term stability. <br />All slopes for the reclaimed facilities should be graded at a minimum slope of 5%. <br />Runoff should be directed across fills as quickly es possible, but should not be <br />allowed to flow down the face of the fill or at the interface between the fill and <br />the existing undisturbed soils. <br />L 1 <br />• <br />