Laserfiche WebLink
3-5 <br />Coal deposited upon this compacted material will be expected to <br />• infiltrate the pad slightly, but should not affect the lower <br />portions of the fill. After coaly material has been stripped from <br />the coal stockpile area, the clean material ( approximately 80,000 <br />cubic yards ) will be placed upon the refuse area and compacte . <br />Topsoil will then be spread and the area readied for revegetation. <br />3.1.9 Wash Plant <br />As with the coal stockpile pad, all coal and coaly material will <br />be removed to the refuse disposal area, the area recontoured and <br />topsoil spread. <br />. 3.1.10 McClane Canyon Haul Road and Conveyor <br />All material used in_fill sections along the road will be <br />excavated and placed in the cutslope areas. Any culverts used <br />along the road will be excavated, disposed of, and all ephemeral <br />drainages will be reconstructed. The disturbed area will then be <br />topsoiled and revegetated. <br />3.1.11 Munger Canyon Conveyor <br />The conveyor alignment will be reclaimed to AOC. The areas will <br />then be backfilled, topsoiled and revegetated. <br /> <br />1/17/86 <br />