Laserfiche WebLink
3-6 <br />3.1.12 Building Area <br />• <br />After the structures and their foundations have been removed, the <br />areas will then be recontoured and topsoil will be spread. Any <br />ephemeral drainages or irrigation ditches will be reconstructed <br />and the area readied for revegetation. <br />• <br /> <br />1/17/86 <br />