Laserfiche WebLink
3-2A <br />s~.ich reclamation activities. The ab+_~ve material will tort,prise <br />appr~~~::imately two feet of the required depth, which the additional <br />tw~~ feet will tie made up ~~f stock:pile~i topsoil material. Overall, <br />the refuse pile well have up to fc+ur feet cif material covering the <br />waste product. <br />This material, ali~rn7 with the necessary amount of t~~psc~il from the <br />tr,psoil stockpile will be spread on the benches and sides of the <br />refuse area. The reads will Ge recor~toure~i an+~ additic~r~al <br />material will be placed on thorn. <br />After successful revegetation has occurred, the- sediment grind will <br />be r'eC131med arni all minor ephemeral drainages in the area will be <br />restored. <br />=.1.~ Refuse Disposal Area Road <br />The r.iad will tie reclaimed Gy remrving material frort~ fill sections <br />along the read and placing it in the cut sections. Since the road <br />has a rt~aterial t~alar~ce within itself, adequate material will be <br />availat~le tr, accomplish this tas4:. All calve-rts will Ge removed <br />ar~d drairiaaes restored, The road will tFier~ tie topsoiled and <br />revegetated. <br />'-alt Creek: will reclaim the surface c.f the area and create small <br />• poc4cc-ts and ~•~ther water--retainir~a configurations sc• that <br />revege•ta1: ion will be enhanced. <br />5/8/85 <br />