Laserfiche WebLink
3-1 <br />• <br />~J <br /> <br />3.0 RECLAMATION PLAN <br />The information contained in this section details reclamation <br />activities for this revision. This information supplements the <br />approved plan in C-020-81. The costs of the reclamation <br />activities are outlined in Table 3.1-15 and a schedule of <br />reclamation is given in Table 3.1-25. <br />3.1 Backfill and Grading <br />All disturbances will be reclaimed to their approximate original <br />contour. Discussion of backfill and grading in this section will <br />follow the outline of Table 3.1-15 to facilitate review. <br />3.1.1 Refuse Disposal Area <br />The major reclamation effort associated with this permit is that <br />associated with the refuse disposal site. The post-mining contour <br />of the refuse area will be as shown in Figure 3.1-15. This will <br />be a result of the disposal of materials during normal daily <br />operations, as discussed in Section 2.4. Upon the termination of <br />mining activities, the basic configuration of the land will have <br />been achieved. <br />1/17/86 <br />