Laserfiche WebLink
3-1B <br />• . 1..3 'S1 urry' F'ond~. <br />Friar to back filling the slurry ponds, 311 slurry 35 well as the <br />t~ent~!nite liner well Ge removed to the refuse disposal arc-a. The <br />p~~rids will tY~eri be bac4~:filled witYi material from the railr~~ad <br />Gypass road. The area will then Ge t~!psailed and prepared for <br />reveaetat i~~n. <br />=. 1.4 Sedimentation ~eservc~ir <br />Friar to reclamation cif the- refuse disposal area, any accumulation <br />..f sediment will be cleaned as part ~!f the rn~rmal r!perational <br />• process. TY~is will leave a clears sedirt~er~t pond prior to <br />reclamation eff~?rts in the central area. Wher. adequate <br />revegetation progress in the- Central 3re3 has occurred, the <br />sediment pond will be recontc~ured, the discharge structures <br />removed, and the area topsoiled. Any sediment realised during <br />reclamation etf~?rts will be in runoff rrom retr!psoiled areas <br />there- <br /> <br />5/8/85 <br />