Laserfiche WebLink
<br />p rGuJ I'NU"~f r~ G( ~ 5'~dC~~i ~~ <br />D. LOADING OIIT FROM RAW MATERIAL STOCKPILE: S ~ c ~~' f P`'%~ <br />Method of loading out (front-end loader, conveyor, etc.) /(/~/~ <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total exposure, partial <br />exposure, moist material, other (specify) <br />vI. <br />Will processing (i.e., crushing, screening, etc.) occur on site? <br />Yes ~ No (Check one) <br />NOTE: ALL PROCESS EQIIIPMENT REQIIIRES A SEPARATE PBRMIT APPLICATION AND <br />APEN (SEPARATE FORM I8 ATTACHED AT END OF THS FORM - MARE ADDITIONAL <br />COPIES AS NEEDED). <br />Material loaded into processing equipment by: /V~~ <br />Conveyor Front end loader Other <br />CONTROLS FOR PROCESSING INCLIIDE: Moist or wet materials (specify <br />moisture $ if known), water spray bars, bag filters, other <br />(specify), no control. If existing processing equipment will be <br />relocated from another location complete the following sections. <br />This equipment must already be permitted. <br />(LIST PROCESSING CONTROLS ZN THE APPROPRIATE SPACES BELOW) <br />A. PRIMARY CRUSHING //~~ . <br />Maximum tons crushed per year tons. <br />Maximum tons crushed per hour tons. <br />Hours of crushing per day hours. <br />Proposed controls (see above) <br />H. SCREENING/CLASSIFYING N /~ <br />Maximum tons screened per year <br />Maximum tons screened per hour <br />Hours of screening per day <br />Proposed controls (see above)_ <br />C. SECONDARY CRUSHING <br />Maximum tons crushed per year <br />Maximum tons crushed per hour <br />Hours of crushing per day _ <br />Proposed controls (see above) <br />/' //' <br /> <br />tons. <br />_ tons. <br />hours. <br />tons. <br />_ tons. <br />hours. <br />5 <br />