Laserfiche WebLink
<br />V. RAW MATERIAL <br />A. REMOVAL <br /> <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />(~. ~~; c: 1 <br />Tons removed per year <br />Maximum tons removed per day !~% <br />Ec;uipment used for removal L ~ <br />c - <br />Ec;uipment capacity (in tons) <br />E:>t. hours per year required for removal <br />I:a material drv, moist, or wet? - <br />Specify moisture content if known ($) L/~~ ~'~-e~c- <br />B. LOADING IN TO RAW MATERIAL STOCKPILE /1'~~ 5 { ~ ~ ~n ~ /` <br />LJ G' ~^ K ~ ~i c~ ~ 1~ V ~ ~'~ ~ k <br />~7 <7 .~ l~ <br />Method of loading in (truck bottom dump, front-end loader, etc.) <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total enclosure, partial <br />enclosure, chemical suppressants, reduced drop height, telescoping <br />chute, other (specify) <br />C. RAW MATERIAL STOCKPILE S r' ~~Ci {J c ~ ~- N / ~- <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Maximum tons stored at any one time <br />Length of time pile remains undisturbed <br />Proposed controls for raw material stockpile: (check appropriate boxes) <br /> <br /> <br />Watering times/day, <br />maintain moist surface). <br />Chemical stabilizer (Type: _ <br />Compacting of piles, method <br />Enclosures: <br />Other (specify) <br />No control <br />or continuous sprinkler (to <br />complete, or partial (check one) <br />4 <br />