Laserfiche WebLink
<br />D. RESCREENING/CLASSIFYING <br />Maximum tons screened per year <br />Maximum tons screened per hour <br />Hours of rescreening per day _ <br />Proposed controls (aee above) <br />VZ:C. CONVEYORS/TRANSFER POINTS <br />A. CONVEYORS N I ~-- <br /> <br />_ tons.. <br />_ tons. <br />hours. <br />Tons of material conveyed per year tons. <br />Tons of material conveyod per day tons. <br />Proposed controls <br />Controls for conveyors include: Full enclosure, partial enclosure, no <br />control, other (specify) <br />(I1!iDICATE ON A SEPARATE DIAGRAM HOW CONVEYOR SYSTEM IS SET IIP) <br />H. TRANSFER POINTS ~/r~} <br />Number of transfer points <br />Proposed controls <br />Controls for transfer points include: Full enclosure, partial <br />enclosure, water sprays, chemical suppressants, no controls, other <br />(s;pecify) <br />N~/+~ <br />6 <br />